PSC
Ordinary 300-day clock.
A post-summary correction fixes a non-legal error or a valuation adjustment after the 7501 is accepted. It is not a dispute of CBP’s legal decision.
PerrottaCustoms Group
Book a consultation
Post-summary corrections & protests
A post-summary correction fixes a non-legal error or a valuation adjustment on the ordinary 300-day clock after the 7501 is accepted. A protest under 19 U.S.C. § 1514 disputes CBP’s decision, generally within 180 days of liquidation. The GRI rationale was captured when we classified the line.
Book a consultation Free Entry AuditA protest package is not reconstructed from memory.
A protest built after liquidation from emails and guesswork is how 19 U.S.C. § 1514 clocks are missed. PSC and protest are different instruments. One fixes a clerical or valuation adjustment on the ordinary 300-day clock. The other disputes CBP’s decision, generally within 180 days of liquidation.
We capture the GRI rationale and CROSS citations when we classify the line. A protest package is assembled from the vault — not from memory.
01 · The method
PSC
A post-summary correction fixes a non-legal error or a valuation adjustment after the 7501 is accepted. It is not a dispute of CBP’s legal decision.
Protest
A protest disputes CBP’s decision, generally within 180 days of liquidation. Different instrument. Different clock.
GRI
The heading rationale and CROSS citations were captured at classification. We do not invent them after the notice arrives.
Clock
The expensive protest is the one filed after the statutory window. We watch the liquidation clock on the same licensed file.
02 · The real cost
Once the protest window closes, the legal dispute is gone. Reconstructing a package from memory after the fact is how that happens. PSC and protest are not interchangeable.
We isolate correction and protest work from live clearance when the file requires it — and we start from facts already in the vault.
03 · On the file
PSC and protest are desk work on clocks. The GRI path sits in the vault with the original entry. A licensed broker still owns the package.
04 · What we need
On the same file
Classification
GRI written when the line was assigned — not after the notice.
Defense
CF-28 and CF-29 are a different instrument from protest.
Entry
The original digital entry is the spine of the package.
Questions we actually get
PSC fixes a non-legal error or valuation adjustment on the ordinary 300-day clock after the 7501 is accepted. A protest under 19 U.S.C. § 1514 disputes CBP’s decision, generally within 180 days of liquidation.
We can try, but a package reconstructed from memory is weak. If we classified the line, the GRI path is already in the vault.
Generally liquidation. Send the notice and the entry number. We will say which clock you are on.
No. CBP Form 28 is a Request for Information. Protest is 19 U.S.C. § 1514. Different instrument. Different desk posture.
The desk
A consultation returns clock analysis and a flat fee. If the window is already closed, we will say so in the memo — not after a retainer.
PerrottaCustoms Group
A licensed U.S. customs brokerage for high-value goods, complex multi-line imports, and high-volume DTC. Lean operation. Live dashboard. A broker still signs the entry.
desk@perrottacustomsgroup.com
Licensed Customs House Broker
Monday–Friday, 08:00–19:00 ET
Perrotta Customs Group is a licensed U.S. customs brokerage. Classification is AI-assisted and always reviewed by a Customs House Broker before any ACE transmission. Duty figures on this site are estimates, not binding CBP rulings, and are not legal advice. Civil penalties under 19 U.S.C. § 1592 attach to the importer of record; we will not transmit an entry we cannot defend.
© 2026 Perrotta Customs Group Serving JFK, EWR, PHL, LAX, and MIA Disclosures